NEWS
Recently, Erzhong Equipment and China Machinery Industrial Products Co., Ltd.(CMIPC)signed the first contract for manufacturing power shovel gear exported for mines, which is in the midst of active R&D at present.
After the contract was signed, designers in Erzhong Equipment spared no time in engaging in the transformation of drawings. Through nonstop work of 120 hours, the work of drawing transformation, drawing review and process analysis was completed in time, which provided precious time for advancing the trial manufacture of the product.
On this basis, the transmission equipment section will continue to track the overall manufacturing process from product processing to inspection to ensure the good quality of the trial manufacturing products at the first inspection, laying a solid foundation for working closely with CMIPC and expanding overseas market for gear products.