NEWS
Recently, two dehydrating towers for Zhejiang Dushan project, undertaken by Zhenjiang Company for the first time, have been successfully shipped.
Zhejiang Dushan project has covered two 2ed dehydrating towers with the 7-meter in diameter and 710-ton in weight, which is a key separation equipment of PTA facility in the Phase Two Project of Dushan Energy New Material Integration Project. The dehydrating tower mainly functions in recycling acetic acid for periodic duty to the maximum degree and also contributes to removing reaction water and other water in the process, which would play an irreplaceable role in the phase two construction.
Zhenjiang Company has mainly been responsible for assembling and welding of all carbon steel parts. In order to improve the management on the site, Zhenjiang Conpmany has introduced the project management system for the first time, which puts the project manager in the coordinating role. Outsourcing manufacturing has also been adopted in the project, the inspectors are responsible for inspection and resources preparation, and the technicians are in charge of the technical service.